We answered an inquiry to help with the redesigning and rebuilding of a small bridge to help cope with the increased levels of water. The old bridge had almost collapsed, and the water was now starting to overflow over the top of it making it impassable during the winter months. We arranged for the bridge to be dug out, and a new large pipe was fitted and reinforced using concrete blocks and concrete. The retaining blockwork was hidden using purbeck walling stone.
top of page
bottom of page